Results by Deliverable

| WP1 | WP2 | WP3 | WP4 | WP5 | WP6 | WP7 | WP8 |

Work Package 1 - UV Climatology
top of page Deliverable Partner Status
1.1 Statement of user requirements for database products NTNU completed
1.2 European UV climatology for ground-based stations RIVM completed
1.3 Climatological UV maps LAP/RIVM completed
1.4 Radiation amplification factors for ozone and albedo FMI completed
1.5 An aerosol climatology for UV modelling UG completed
X1.1 Estimate of the natural level and variability of surface UVR over Belsk IGFPAS completed
X1.2 Method for the reconstruction of UVR time series at European sites IGFPAS completed
X1.3 UV climatology for the Tartu Observatory site TO completed
X1.4 Calculation of weighted doses for selected European sites TO completed
 
Work Package 2 - Data Analysis
top of page Deliverable Partner Status
2.1 An evaluation of the impact of atmospheric variability on the detection of trends in UV FMI completed
2.2 A definition of the optimal wavelength band and optimal European site for trend analysis UHAN completed
2.3 An estimate of the number of years required for trend detection at various European sites UHAN completed
2.4 A search for a trend in UV irradiance at selected European sites UHAN completed
X2.1 Neural model capable of estimating spectral UV irradiance CHMI completed
X2.2 Estimate of changes in surface UVR over the period 1960-2000 at selected stations CHMI completed
X2.3 Estimate of trend variability in Belsk and for 2 other stations IGFPAS completed
X2.4 Algorithm for UVI forecast for seven European stations IMWM completed
X2.5 CMF for seven European stations IMWM completed
 
Work Package 3 - Data Collection & Submission
top of page Deliverable Partner Status
3.1 Submission of UV spectral and broadband data from 20 European sites BOKU completed
3.2 Verification of automatic quality checks performed at the database UG completed
3.3 Report on final state of data quality and quantity in the database UG completed
X3.1 Submission of spectra for the period 1994-2001 CHMI completed
X3.2 Submission of spectra and broadband measurements IGFPAS completed
X3.3 Submission of erythemal irradiance data for the period 1998-2002 TO completed
X3.4 Submission of erythemal irradiance data for the period 1994-2000 IMWM completed
 
Work Package 4 - Database Management
top of page Deliverable Partner Status
4.1 Installation of new hardware at database site FMI completed
4.2 Installation of WWW data submission tools with on-line user's guide FMI completed
4.3 Addition of further Oracle structures for non-spectral and ancillary data BAS/FMI completed
4.4 Provision of web pages to provide search access to the Oracle database and guidance to users FMI completed
4.5 Updated and validated metadata pages for the database UMIST completed
4.6 Report & test on all database search and access tools; publishing of user's guide and manual, with copy made available at web site UG completed
 
Work Package 5 - Development of Database Facilities
top of page Deliverable Partner Status
5.1 Installation of software tools to calculate products from spectral data in the database BAS/FMI completed
5.2 Installation of web page retrieval tools for spectral data, with on-line user's guide FMI completed
5.3 Installation of web page retrieval tools for data products, with on-line user's guide BAS completed
5.4 Incorporation of cloud information in the database NPI completed
5.5 Testing and documentation of all data retrieval tools UG completed
X5.1 Implementation at the webpage interface of on-line and automatically updated information pages giving details of recent data submission CHMI completed
X5.2 Implementation of new options in output file formats at the webpage interface CHMI completed
 
Work Package 6 - Quality Assurance at the Database
top of page Deliverable Partner Status
6.1 Flagging spectral irradiance for wavelength shifts and spectral anomalies RIVM completed
6.2 Flagging of atmospheric anomalies NPI completed
6.3 Quality assurance as seen from the database BAS completed
6.4 Report on database flagging LAP completed
 
Work Package 7 - QA & QC at the Measuring Sites
top of page Deliverable Partner Status
7.1 Inventory of QC procedures and correction tools used at all sites UI completed
7.2 Quality audit of major sites UG completed
7.3 Recommendations of QC tools relating to instrument characteristics RIVM completed
7.4 Improvement of existing QC-tools (SHIC package) at the sites for wavelength shift and spectral anomaly checking RIVM completed
 
Work Package 8 - Modelling
top of page Deliverable Partner Status
8.1 Development of fast model for data analysis, extended to account for aerosol, cloudy and snow conditions NPI completed
8.2 Reconstruction of spectra from filter radiometers UJF completed
8.3 Review on 3D effects in other wavelength ranges UJF completed
8.4 Characterisation and quantification of effects of topography and surface inhomogeneity for selected EDUCE stations NILU completed
8.5 Paremetrisation for cloud and aerosol effects on monthly and seasonal spectral irradiances UJF completed
8.6 Report on studies of ultraviolet sky radiance and sky anisotropy UI/UJF completed
8.7 Report on the importance of polarisation in calculations of radiance and irradiance UJF completed

Last change to these pages: 17 February 2004