IM Site Audit - May 2002

The full report on the IM audit is available as a PDF file (201 kB)

This graphical summary should be viewed in conjunction with the Audit Definition
and the full Audit Report.

  .1 .2 .3 .4 .5 .6 .7 .8 .9 .10 .11 .12 .13 .14
Resources 1   C B                      
Location 2 B C B                      
Operational Matters 3 B B A A   B B B            
Instrumentation 4 B C C C C B                
Calibration (spectral) 5                 D       B    
Measurement Regime 6 B B B C B B                
Data Procesing 7 B B C C C D D   C   A Exemplary  
Quality Management 8 B B C B B           B Satisfactory  
              C Could be improved
D Should be improved
  Not gradeable  
  Not assessed  

This graphical summary should be viewed in conjunction with the Audit Definition
and the full Audit Report.


The Brewer spectroradiometer
on the roof of the IM building
(looking East)

Monthly averages for precipitation,
sunshine and AOD

Image centred on IM building
with Lisbon airport to the West

Map showing location of IM building
in the North of Lisbon



Last update to these pages: 04 June 2002